− | This page contains a hyperlinked list of pages that have been completed |
+ | This page contains a hyperlinked list of pages that have been completed. Topics that are not hyperlinked have not yet been written (editors required!), but are relevant to the overall subject. It is hoped that with time, these guides will accumulate into a useful resource, not only for undergraduate mining students, but also for industry practitioners. Comments on any of these topics can be left in the ''discussion'' page attached to each topic page. |
− | List of topics |
+ | List of topics related to the mine design process: |
+ | |||
+ | ==The general environment in which the mine exists== |
||
+ | |||
+ | * Company Objectives |
||
+ | |||
+ | ** Description of objectives |
||
+ | |||
+ | * General mine site considerations |
||
+ | ** Location and access |
||
+ | ** Confirmation of legal ownership of property |
||
+ | ** Exploration and development committments |
||
+ | ** Infrastructure availability |
||
+ | ** Previous production |
||
+ | |||
+ | * The social commitments |
||
+ | ** [[Social engagement]] |
||
+ | ** Environmental Permitting |
||
+ | ** Legal environment |
||
+ | |||
+ | * Business drivers |
||
+ | |||
+ | * Risks and Benchmarking |
||
+ | |||
+ | * Organizational Design |
||
==Information required for mine design== |
==Information required for mine design== |
||
+ | * [[Ore deposit models]] |
||
* [[The geological model]] |
* [[The geological model]] |
||
* [[Geostatistics and resource estimation techniques]] |
* [[Geostatistics and resource estimation techniques]] |
||
**[[Sampling QAQC]] |
**[[Sampling QAQC]] |
||
* [[Cut-off grade estimation]] |
* [[Cut-off grade estimation]] |
||
+ | **[[Polymetallic deposit cut-off grade estimation]] |
||
+ | *[[Mining in the Arctic]] |
||
==The stages of mine design== |
==The stages of mine design== |
||
Line 28: | Line 31: | ||
**[[Discontinuity characterization]] |
**[[Discontinuity characterization]] |
||
**[[Geotechnical drilling]] |
**[[Geotechnical drilling]] |
||
⚫ | |||
**[[Sampling]] |
**[[Sampling]] |
||
**[[Geotechnical model]] |
**[[Geotechnical model]] |
||
*[[Stress measurement]] |
*[[Stress measurement]] |
||
⚫ | |||
+ | **[[Paleostress analysis]] |
||
*[[Stability Graph Method]] |
*[[Stability Graph Method]] |
||
*[[Numerical modelling]] |
*[[Numerical modelling]] |
||
Line 38: | Line 42: | ||
**[[Instrumentation for ground support design]] |
**[[Instrumentation for ground support design]] |
||
*[[Mine dewatering]] |
*[[Mine dewatering]] |
||
+ | *[[Mine waste dump stability analysis]] |
||
+ | *[[Dynamic stability analysis of tailings dams]] |
||
*[[Mining induced seismicity]] |
*[[Mining induced seismicity]] |
||
+ | **[[Seismic event relocation techniques]] |
||
+ | **[[Seismic moment tensor]] |
||
==Mining methods== |
==Mining methods== |
||
Line 45: | Line 53: | ||
*[[Selection of mining method]] |
*[[Selection of mining method]] |
||
*[[Estimation of the potential production rate]] |
*[[Estimation of the potential production rate]] |
||
+ | *[[Dilution and ore recovery]] |
||
*[[Block caving]] |
*[[Block caving]] |
||
*[[Sublevel caving]] |
*[[Sublevel caving]] |
||
Line 60: | Line 69: | ||
*[[Hard-rock room and pillar]] |
*[[Hard-rock room and pillar]] |
||
**[[Pillar design]] |
**[[Pillar design]] |
||
+ | *[[Crown pillars]] |
||
+ | *[[Solution mining]] |
||
==Mine infrastructure== |
==Mine infrastructure== |
||
*[[Equipment selection]] |
*[[Equipment selection]] |
||
⚫ | |||
+ | **[[Electric equipment]] |
||
+ | **[[Autonomous equipment]] |
||
*[[Shaft vs. Ramp Access]] |
*[[Shaft vs. Ramp Access]] |
||
*[[Underground Ramp Design Parameters | Ramp design]] |
*[[Underground Ramp Design Parameters | Ramp design]] |
||
Line 70: | Line 82: | ||
**[[Mine hoisting systems]] |
**[[Mine hoisting systems]] |
||
**[[Mine hoisting ropes]] |
**[[Mine hoisting ropes]] |
||
+ | *[[Material handling systems]] |
||
⚫ | |||
+ | **[[Conveyor systems]] |
||
⚫ | |||
*[[Access drifts]] |
*[[Access drifts]] |
||
+ | **[[Drilling patterns]] |
||
*[[Mine service facilities]] |
*[[Mine service facilities]] |
||
**[[Refuge stations]] |
**[[Refuge stations]] |
||
Line 77: | Line 94: | ||
**[[Explosive magazines]] |
**[[Explosive magazines]] |
||
**[[Fuel storage]] |
**[[Fuel storage]] |
||
⚫ | |||
*[[Ventilation]] |
*[[Ventilation]] |
||
+ | **[[Ventilation air heating]] |
||
*[[Use of explosives]] |
*[[Use of explosives]] |
||
**[[Comparison of explosives]] |
**[[Comparison of explosives]] |
||
Line 87: | Line 104: | ||
**[[Backfill pipeline and delivery systems]] |
**[[Backfill pipeline and delivery systems]] |
||
**[[Backfill distribution system design]] |
**[[Backfill distribution system design]] |
||
− | *[[Port |
+ | *[[Port Facilities]] |
*[[Ice roads]] |
*[[Ice roads]] |
||
+ | *[[Energy considerations for off-grid mines]] |
||
+ | *[[Fly-in fly-out mines]] |
||
+ | |||
+ | == Mineral processing == |
||
+ | |||
+ | *[[Gold extraction]] |
||
== Economics and finance == |
== Economics and finance == |
||
Line 99: | Line 122: | ||
*[[Net smelter return]] |
*[[Net smelter return]] |
||
*[[Project Evaluation Methods]] |
*[[Project Evaluation Methods]] |
||
+ | **[[Sensitivity Analysis]] |
||
**[[Monte Carlo simulation]] |
**[[Monte Carlo simulation]] |
||
*[[Metal price forecasting]] |
*[[Metal price forecasting]] |
||
*[[Equipment purchase vs leasing]] |
*[[Equipment purchase vs leasing]] |
||
+ | *[[Shipping costs]] |
||
==Mining regulations, permitting== |
==Mining regulations, permitting== |
||
Line 107: | Line 132: | ||
*[[Mining regulations]] |
*[[Mining regulations]] |
||
*[[Social engagement]] |
*[[Social engagement]] |
||
+ | *[[Environmental permitting]] |
||
+ | **[[Environmental permitting in Ontario]] |
Latest revision as of 17:36, 16 September 2019
This page contains a hyperlinked list of pages that have been completed. Topics that are not hyperlinked have not yet been written (editors required!), but are relevant to the overall subject. It is hoped that with time, these guides will accumulate into a useful resource, not only for undergraduate mining students, but also for industry practitioners. Comments on any of these topics can be left in the discussion page attached to each topic page.
List of topics related to the mine design process:
Contents
The general environment in which the mine exists
- Company Objectives
- Description of objectives
- General mine site considerations
- Location and access
- Confirmation of legal ownership of property
- Exploration and development committments
- Infrastructure availability
- Previous production
- The social commitments
- Social engagement
- Environmental Permitting
- Legal environment
- Business drivers
- Risks and Benchmarking
- Organizational Design
Information required for mine design
- Ore deposit models
- The geological model
- Geostatistics and resource estimation techniques
- Cut-off grade estimation
- Mining in the Arctic
The stages of mine design
- The stages of mine design
- Pre-evaluation study
- Scoping study
- Pre-feasibility study
- Feasibility study
- Detailed design
- Project management principles
Geotechnical engineering
- Master list of tasks required for various stages of mine design
- Site investigation and rock mass characterization
- Geotechnical site investigation
- Stress measurement
- Stability Graph Method
- Numerical modelling
- Ground support
- Mine dewatering
- Mine waste dump stability analysis
- Dynamic stability analysis of tailings dams
- Mining induced seismicity
Mining methods
- Factors influencing mining method selection
- Selection of mining method
- Estimation of the potential production rate
- Dilution and ore recovery
- Block caving
- Sublevel caving
- Cut and fill
- Longhole mining
- Shrinkage stoping
- Hard-rock room and pillar
- Crown pillars
- Solution mining
Mine infrastructure
- Equipment selection
- Shaft vs. Ramp Access
- Ramp design
- Shaft construction
- Material handling systems
- Access drifts
- Mine service facilities
- Ventilation
- Use of explosives
- Backfill
- Port Facilities
- Ice roads
- Energy considerations for off-grid mines
- Fly-in fly-out mines
Mineral processing
Economics and finance
- Economic Evaluation Checklist - Mineral Projects
- Project economics
- Net smelter return
- Project Evaluation Methods
- Metal price forecasting
- Equipment purchase vs leasing
- Shipping costs