Difference between revisions of "Design topics available"
From QueensMineDesignWiki
SDMcKinnon (talk | contribs) (→Geotechnical engineering) |
SDMcKinnon (talk | contribs) |
||
(15 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | This page contains a hyperlinked list of pages that have been completed |
+ | This page contains a hyperlinked list of pages that have been completed. Topics that are not hyperlinked have not yet been written (editors required!), but are relevant to the overall subject. It is hoped that with time, these guides will accumulate into a useful resource, not only for undergraduate mining students, but also for industry practitioners. Comments on any of these topics can be left in the ''discussion'' page attached to each topic page. |
− | List of topics |
+ | List of topics related to the mine design process: |
+ | |||
+ | ==The general environment in which the mine exists== |
||
+ | |||
+ | * Company Objectives |
||
+ | |||
+ | ** Description of objectives |
||
+ | |||
+ | * General mine site considerations |
||
+ | ** Location and access |
||
+ | ** Confirmation of legal ownership of property |
||
+ | ** Exploration and development committments |
||
+ | ** Infrastructure availability |
||
+ | ** Previous production |
||
+ | |||
+ | * The social commitments |
||
+ | ** [[Social engagement]] |
||
+ | ** Environmental Permitting |
||
+ | ** Legal environment |
||
+ | |||
+ | * Business drivers |
||
+ | |||
+ | * Risks and Benchmarking |
||
+ | |||
+ | * Organizational Design |
||
==Information required for mine design== |
==Information required for mine design== |
||
+ | * [[Ore deposit models]] |
||
* [[The geological model]] |
* [[The geological model]] |
||
* [[Geostatistics and resource estimation techniques]] |
* [[Geostatistics and resource estimation techniques]] |
||
**[[Sampling QAQC]] |
**[[Sampling QAQC]] |
||
* [[Cut-off grade estimation]] |
* [[Cut-off grade estimation]] |
||
+ | **[[Polymetallic deposit cut-off grade estimation]] |
||
*[[Mining in the Arctic]] |
*[[Mining in the Arctic]] |
||
Line 29: | Line 31: | ||
**[[Discontinuity characterization]] |
**[[Discontinuity characterization]] |
||
**[[Geotechnical drilling]] |
**[[Geotechnical drilling]] |
||
⚫ | |||
**[[Sampling]] |
**[[Sampling]] |
||
**[[Geotechnical model]] |
**[[Geotechnical model]] |
||
*[[Stress measurement]] |
*[[Stress measurement]] |
||
⚫ | |||
+ | **[[Paleostress analysis]] |
||
*[[Stability Graph Method]] |
*[[Stability Graph Method]] |
||
*[[Numerical modelling]] |
*[[Numerical modelling]] |
||
Line 40: | Line 43: | ||
*[[Mine dewatering]] |
*[[Mine dewatering]] |
||
*[[Mine waste dump stability analysis]] |
*[[Mine waste dump stability analysis]] |
||
+ | *[[Dynamic stability analysis of tailings dams]] |
||
*[[Mining induced seismicity]] |
*[[Mining induced seismicity]] |
||
+ | **[[Seismic event relocation techniques]] |
||
+ | **[[Seismic moment tensor]] |
||
==Mining methods== |
==Mining methods== |
||
Line 63: | Line 69: | ||
*[[Hard-rock room and pillar]] |
*[[Hard-rock room and pillar]] |
||
**[[Pillar design]] |
**[[Pillar design]] |
||
+ | *[[Crown pillars]] |
||
*[[Solution mining]] |
*[[Solution mining]] |
||
Line 69: | Line 76: | ||
*[[Equipment selection]] |
*[[Equipment selection]] |
||
**[[Electric equipment]] |
**[[Electric equipment]] |
||
⚫ | |||
+ | **[[Autonomous equipment]] |
||
*[[Shaft vs. Ramp Access]] |
*[[Shaft vs. Ramp Access]] |
||
*[[Underground Ramp Design Parameters | Ramp design]] |
*[[Underground Ramp Design Parameters | Ramp design]] |
||
Line 75: | Line 82: | ||
**[[Mine hoisting systems]] |
**[[Mine hoisting systems]] |
||
**[[Mine hoisting ropes]] |
**[[Mine hoisting ropes]] |
||
⚫ | |||
⚫ | |||
+ | **[[Conveyor systems]] |
||
⚫ | |||
*[[Access drifts]] |
*[[Access drifts]] |
||
+ | **[[Drilling patterns]] |
||
*[[Mine service facilities]] |
*[[Mine service facilities]] |
||
**[[Refuge stations]] |
**[[Refuge stations]] |
||
Line 82: | Line 94: | ||
**[[Explosive magazines]] |
**[[Explosive magazines]] |
||
**[[Fuel storage]] |
**[[Fuel storage]] |
||
⚫ | |||
⚫ | |||
*[[Ventilation]] |
*[[Ventilation]] |
||
**[[Ventilation air heating]] |
**[[Ventilation air heating]] |
Latest revision as of 17:36, 16 September 2019
This page contains a hyperlinked list of pages that have been completed. Topics that are not hyperlinked have not yet been written (editors required!), but are relevant to the overall subject. It is hoped that with time, these guides will accumulate into a useful resource, not only for undergraduate mining students, but also for industry practitioners. Comments on any of these topics can be left in the discussion page attached to each topic page.
List of topics related to the mine design process:
Contents
The general environment in which the mine exists
- Company Objectives
- Description of objectives
- General mine site considerations
- Location and access
- Confirmation of legal ownership of property
- Exploration and development committments
- Infrastructure availability
- Previous production
- The social commitments
- Social engagement
- Environmental Permitting
- Legal environment
- Business drivers
- Risks and Benchmarking
- Organizational Design
Information required for mine design
- Ore deposit models
- The geological model
- Geostatistics and resource estimation techniques
- Cut-off grade estimation
- Mining in the Arctic
The stages of mine design
- The stages of mine design
- Pre-evaluation study
- Scoping study
- Pre-feasibility study
- Feasibility study
- Detailed design
- Project management principles
Geotechnical engineering
- Master list of tasks required for various stages of mine design
- Site investigation and rock mass characterization
- Geotechnical site investigation
- Stress measurement
- Stability Graph Method
- Numerical modelling
- Ground support
- Mine dewatering
- Mine waste dump stability analysis
- Dynamic stability analysis of tailings dams
- Mining induced seismicity
Mining methods
- Factors influencing mining method selection
- Selection of mining method
- Estimation of the potential production rate
- Dilution and ore recovery
- Block caving
- Sublevel caving
- Cut and fill
- Longhole mining
- Shrinkage stoping
- Hard-rock room and pillar
- Crown pillars
- Solution mining
Mine infrastructure
- Equipment selection
- Shaft vs. Ramp Access
- Ramp design
- Shaft construction
- Material handling systems
- Access drifts
- Mine service facilities
- Ventilation
- Use of explosives
- Backfill
- Port Facilities
- Ice roads
- Energy considerations for off-grid mines
- Fly-in fly-out mines
Mineral processing
Economics and finance
- Economic Evaluation Checklist - Mineral Projects
- Project economics
- Net smelter return
- Project Evaluation Methods
- Metal price forecasting
- Equipment purchase vs leasing
- Shipping costs