Difference between revisions of "Design topics available"
From QueensMineDesignWiki
SDMcKinnon (talk | contribs) |
|||
(76 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
− | This page contains a hyperlinked list of pages that have been completed |
+ | This page contains a hyperlinked list of pages that have been completed. Topics that are not hyperlinked have not yet been written (editors required!), but are relevant to the overall subject. It is hoped that with time, these guides will accumulate into a useful resource, not only for undergraduate mining students, but also for industry practitioners. Comments on any of these topics can be left in the ''discussion'' page attached to each topic page. |
− | List of topics |
+ | List of topics related to the mine design process: |
+ | |||
+ | ==The general environment in which the mine exists== |
||
+ | |||
+ | * Company Objectives |
||
+ | |||
+ | ** Description of objectives |
||
+ | |||
+ | * General mine site considerations |
||
+ | ** Location and access |
||
+ | ** Confirmation of legal ownership of property |
||
+ | ** Exploration and development committments |
||
+ | ** Infrastructure availability |
||
+ | ** Previous production |
||
+ | |||
+ | * The social commitments |
||
+ | ** [[Social engagement]] |
||
+ | ** Environmental Permitting |
||
+ | ** Legal environment |
||
+ | |||
+ | * Business drivers |
||
+ | |||
+ | * Risks and Benchmarking |
||
+ | |||
+ | * Organizational Design |
||
==Information required for mine design== |
==Information required for mine design== |
||
− | *[[ |
+ | * [[Ore deposit models]] |
− | *[[ |
+ | * [[The geological model]] |
+ | * [[Geostatistics and resource estimation techniques]] |
||
+ | **[[Sampling QAQC]] |
||
+ | * [[Cut-off grade estimation]] |
||
+ | **[[Polymetallic deposit cut-off grade estimation]] |
||
+ | *[[Mining in the Arctic]] |
||
+ | |||
+ | ==The stages of mine design== |
||
+ | |||
+ | * [[The stages of mine design]] |
||
+ | * [[Pre-evaluation study]] |
||
+ | * [[Scoping study]] |
||
+ | * [[Pre-feasibility study]] |
||
+ | * [[Feasibility study]] |
||
+ | * Detailed design |
||
+ | * Project management principles |
||
==Geotechnical engineering== |
==Geotechnical engineering== |
||
*[[The stages of mine design | Master list of tasks required for various stages of mine design]] |
*[[The stages of mine design | Master list of tasks required for various stages of mine design]] |
||
+ | *[[Site investigation and rock mass characterization]] |
||
+ | *[[Geotechnical site investigation]] |
||
+ | **[[Geotechnical logging techniques]] |
||
+ | **[[Discontinuity characterization]] |
||
+ | **[[Geotechnical drilling]] |
||
⚫ | |||
+ | **[[Sampling]] |
||
+ | **[[Geotechnical model]] |
||
+ | *[[Stress measurement]] |
||
+ | **[[Paleostress analysis]] |
||
+ | *[[Stability Graph Method]] |
||
+ | *[[Numerical modelling]] |
||
+ | **[[Numerical modelling - constitutive models | Constitutive models]] |
||
*[[Ground support]] |
*[[Ground support]] |
||
**[[Instrumentation for ground support design]] |
**[[Instrumentation for ground support design]] |
||
⚫ | |||
⚫ | |||
*[[Mine dewatering]] |
*[[Mine dewatering]] |
||
⚫ | |||
+ | *[[Mine waste dump stability analysis]] |
||
+ | *[[Dynamic stability analysis of tailings dams]] |
||
*[[Mining induced seismicity]] |
*[[Mining induced seismicity]] |
||
+ | **[[Seismic event relocation techniques]] |
||
+ | **[[Seismic moment tensor]] |
||
==Mining methods== |
==Mining methods== |
||
*[[Factors influencing mining method selection]] |
*[[Factors influencing mining method selection]] |
||
+ | *[[Selection of mining method]] |
||
+ | *[[Estimation of the potential production rate]] |
||
+ | *[[Dilution and ore recovery]] |
||
*[[Block caving]] |
*[[Block caving]] |
||
*[[Sublevel caving]] |
*[[Sublevel caving]] |
||
*[[Cut and fill]] |
*[[Cut and fill]] |
||
− | *[[Underhand cut and fill]] |
+ | **[[Underhand cut and fill]] |
− | **[[Lucky Friday Mine]] |
+ | ***[[Lucky Friday Mine]] |
− | *[[ |
+ | **[[Ramp-in-vein]] |
− | * |
+ | *Longhole mining |
− | *[[ |
+ | **[[Longitudinal longhole retreat]] |
− | *[[ |
+ | **[[Transverse longhole stoping]] |
+ | **[[Sub-level open stoping]] |
||
+ | **[[Vertical crater retreat]] |
||
+ | **[[Stope sequencing]] |
||
*[[Shrinkage stoping]] |
*[[Shrinkage stoping]] |
||
*[[Hard-rock room and pillar]] |
*[[Hard-rock room and pillar]] |
||
+ | **[[Pillar design]] |
||
+ | *[[Crown pillars]] |
||
+ | *[[Solution mining]] |
||
==Mine infrastructure== |
==Mine infrastructure== |
||
− | *[[Crushers]] |
||
+ | *[[Equipment selection]] |
||
+ | **[[Electric equipment]] |
||
+ | **[[Autonomous equipment]] |
||
*[[Shaft vs. Ramp Access]] |
*[[Shaft vs. Ramp Access]] |
||
+ | *[[Underground Ramp Design Parameters | Ramp design]] |
||
*[[Shaft construction]] |
*[[Shaft construction]] |
||
**[[Mine hoisting systems]] |
**[[Mine hoisting systems]] |
||
**[[Mine hoisting ropes]] |
**[[Mine hoisting ropes]] |
||
− | *[[Refuge stations]] |
||
+ | *[[Material handling systems]] |
||
− | *[[Ore and waste passes]] |
+ | **[[Ore and waste passes]] |
+ | **[[Conveyor systems]] |
||
+ | **[[Crushers]] |
||
+ | *[[Access drifts]] |
||
+ | **[[Drilling patterns]] |
||
+ | *[[Mine service facilities]] |
||
+ | **[[Refuge stations]] |
||
+ | **[[Maintenance facilities]] |
||
+ | **[[Underground storage facilities]] |
||
+ | **[[Explosive magazines]] |
||
+ | **[[Fuel storage]] |
||
*[[Ventilation]] |
*[[Ventilation]] |
||
+ | **[[Ventilation air heating]] |
||
+ | *[[Use of explosives]] |
||
+ | **[[Comparison of explosives]] |
||
⚫ | |||
+ | **[[Backfill material]] |
||
+ | **[[Backfill properties]] |
||
⚫ | |||
+ | **[[Backfill pipeline and delivery systems]] |
||
+ | **[[Backfill distribution system design]] |
||
+ | *[[Port Facilities]] |
||
+ | *[[Ice roads]] |
||
+ | *[[Energy considerations for off-grid mines]] |
||
+ | *[[Fly-in fly-out mines]] |
||
+ | |||
+ | == Mineral processing == |
||
+ | |||
+ | *[[Gold extraction]] |
||
== Economics and finance == |
== Economics and finance == |
||
+ | *[[Economic Evaluation Checklist - Mineral Projects]] |
||
*[[Project economics]] |
*[[Project economics]] |
||
+ | **[[Discount rate]] |
||
+ | **[[Depreciation]] |
||
+ | **[[Taxation]] |
||
+ | *[[Net smelter return]] |
||
*[[Project Evaluation Methods]] |
*[[Project Evaluation Methods]] |
||
− | *[https://queensminedesign.miningexcellence.ca/index.php/Metal_price_forecasting Metal Price Forecasting]<br> |
||
+ | **[[Sensitivity Analysis]] |
||
+ | **[[Monte Carlo simulation]] |
||
+ | *[[Metal price forecasting]] |
||
+ | *[[Equipment purchase vs leasing]] |
||
+ | *[[Shipping costs]] |
||
− | ==Mining regulations, permitting |
+ | ==Mining regulations, permitting== |
*[[Mining regulations]] |
*[[Mining regulations]] |
||
*[[Social engagement]] |
*[[Social engagement]] |
||
+ | *[[Environmental permitting]] |
||
+ | **[[Environmental permitting in Ontario]] |
Latest revision as of 17:36, 16 September 2019
This page contains a hyperlinked list of pages that have been completed. Topics that are not hyperlinked have not yet been written (editors required!), but are relevant to the overall subject. It is hoped that with time, these guides will accumulate into a useful resource, not only for undergraduate mining students, but also for industry practitioners. Comments on any of these topics can be left in the discussion page attached to each topic page.
List of topics related to the mine design process:
Contents
The general environment in which the mine exists
- Company Objectives
- Description of objectives
- General mine site considerations
- Location and access
- Confirmation of legal ownership of property
- Exploration and development committments
- Infrastructure availability
- Previous production
- The social commitments
- Social engagement
- Environmental Permitting
- Legal environment
- Business drivers
- Risks and Benchmarking
- Organizational Design
Information required for mine design
- Ore deposit models
- The geological model
- Geostatistics and resource estimation techniques
- Cut-off grade estimation
- Mining in the Arctic
The stages of mine design
- The stages of mine design
- Pre-evaluation study
- Scoping study
- Pre-feasibility study
- Feasibility study
- Detailed design
- Project management principles
Geotechnical engineering
- Master list of tasks required for various stages of mine design
- Site investigation and rock mass characterization
- Geotechnical site investigation
- Stress measurement
- Stability Graph Method
- Numerical modelling
- Ground support
- Mine dewatering
- Mine waste dump stability analysis
- Dynamic stability analysis of tailings dams
- Mining induced seismicity
Mining methods
- Factors influencing mining method selection
- Selection of mining method
- Estimation of the potential production rate
- Dilution and ore recovery
- Block caving
- Sublevel caving
- Cut and fill
- Longhole mining
- Shrinkage stoping
- Hard-rock room and pillar
- Crown pillars
- Solution mining
Mine infrastructure
- Equipment selection
- Shaft vs. Ramp Access
- Ramp design
- Shaft construction
- Material handling systems
- Access drifts
- Mine service facilities
- Ventilation
- Use of explosives
- Backfill
- Port Facilities
- Ice roads
- Energy considerations for off-grid mines
- Fly-in fly-out mines
Mineral processing
Economics and finance
- Economic Evaluation Checklist - Mineral Projects
- Project economics
- Net smelter return
- Project Evaluation Methods
- Metal price forecasting
- Equipment purchase vs leasing
- Shipping costs