Difference between revisions of "Design topics available"
From QueensMineDesignWiki
SDMcKinnon (talk | contribs) (→Mining methods) |
SDMcKinnon (talk | contribs) (→Mining methods) |
||
Line 28: | Line 28: | ||
**[[Underhand cut and fill]] |
**[[Underhand cut and fill]] |
||
***[[Lucky Friday Mine]] |
***[[Lucky Friday Mine]] |
||
− | + | **[[Ramp-in-vein]] |
|
*[[Longitudinal longhole retreat]] |
*[[Longitudinal longhole retreat]] |
||
*[[Transverse longhole stoping]] |
*[[Transverse longhole stoping]] |
Revision as of 18:14, 25 March 2014
This page contains a hyperlinked list of pages that have been completed as part of Mine 448 - underground mine design project. Each topic has been completed as part of the course requirements for the design groups. It is hoped that with time, these guides will accumulate into a useful resource for the course. Comments on any of these topics can be left in the discussion page attached to each topic page.
List of topics for which pages are available:
Contents
Information required for mine design
Geotechnical engineering
- Master list of tasks required for various stages of mine design
- Ground support
- Backfill
- Mine dewatering
- Rock mass characterization using geophysical methods
- Mining induced seismicity
Mining methods
- Factors influencing mining method selection
- Estimation of the potential production rate
- Block caving
- Sublevel caving
- Cut and fill
- Longitudinal longhole retreat
- Transverse longhole stoping
- Sub-level open stoping
- Vertical crater retreat
- Shrinkage stoping
- Hard-rock room and pillar
Mine infrastructure
- Crushers
- Shaft vs. Ramp Access
- Ramp design
- Shaft construction
- Refuge stations
- Ore and waste passes
- Ventilation