Difference between revisions of "Design topics available"

From QueensMineDesignWiki
Jump to: navigation, search
(Mining methods)
(added stope sequencing)
Line 44: Line 44:
 
***[[Lucky Friday Mine]]
 
***[[Lucky Friday Mine]]
 
**[[Ramp-in-vein]]
 
**[[Ramp-in-vein]]
*[[Longitudinal longhole retreat]]
 
  +
*[[Longhole mining]]
*[[Transverse longhole stoping]]
+
**[[Longitudinal longhole retreat]]
  +
**[[Transverse longhole stoping]]
  +
**[[Stope sequencing]]
 
*[[Sub-level open stoping]]
 
*[[Sub-level open stoping]]
 
*[[Vertical crater retreat]]
 
*[[Vertical crater retreat]]

Revision as of 14:53, 3 February 2015

This page contains a hyperlinked list of pages that have been completed as part of Mine 448 - underground mine design project. Each topic has been completed as part of the course requirements for the design groups. It is hoped that with time, these guides will accumulate into a useful resource for the course. Comments on any of these topics can be left in the discussion page attached to each topic page.

List of topics for which pages are available:

Information required for mine design

The stages of mine design

Geotechnical engineering

Mining methods

Mine infrastructure

Economics and finance

Mining regulations, permitting